대표전화02-6952-9497~8
대표전화seoul_show@korfish.or.kr
  • 영문서브비주얼1

Other Information

Installation of power
(40 USD/1KW | 50 USD/24 hours 1KW)
a. The supply of power in the exhibition hall is single phase 220V (general electronic devices) and three phase 220V (industrial electronic devices), so if you need 110V, exhibitors must prepare AVR or downtrans separately.

b. Basic stand shell booth : The installation of electric distributing main line in the booth and the use of power other than lighting must be applied separately.
(If you need additional capacity except for the basic 1KW, you should calculate the W of the device you will use and make an application for additionally spare watt)
If it is confirmed that you have applied for an electricity capacity that falls short of the required capacity during the preparation period, the relevant company must apply for an additional capacity of insufficient electricity.
This is to prevent accidents and maintain the safety of the venue, and if the occurrence of a fire in the exhibition hall causes damage to another company due to overload, appropriate compensation should be made to the Seoul International Seafood Show Secretariat and each event venue or the affected company.

c. Especially when you display sensitive equipment, you have to install your own safety devices.
During the event, the supply of electricity from the booth in the exhibition hall is automatically turned off 30 minutes after the exhibition.
★ If you use refrigeration and freezing facilities, you must fill out an application for additional 24-hour use of electricity and submit it to the secretariat of the Seoul International Seafood Show.

d. Connecting an MULTI-PLUG to an electrical SOCKET at random can lead to a fire caused by an overload.
For safety, you must work only through an official electric designated company for any electrical construction.
LAN
(120 USD/port)
a. Each port comes with an individual IP and the port line is tagged with an IP address.
b. T1 class LAN is supplied.
c. Details are written in the application form for the use of auxiliary facilities.
d. 150,000 won/line (VAT separate)
Plumbing/compressed air
(120 USD/place)
a. Plumbing and compressed air are supplied to the company's requested location. (Prior notice of location necessary)
Customer Management System
(180 USD/unit)
a. During the exhibition, if the barcode of the visitor's pass to the booth is scanned by the barcode reader, the visitor's information is provided to the applicant company.
★ All visitors who visit this exhibition will receive a pass that stores the visitor's personal information at the entrance of the exhibition hall.
Equipment rental and refrigeration & freezer rental
a. If you want additional equipment other than the basic equipment provided to each participating company, please refer to the catalog of the ‘Equipment Rental Application Form’ and apply separately.
b. When renting refrigeration and freezer, please refer to the catalog in the ‘Refrigeration & Freezer Application Form’ and apply separately.
c. The rental product above will be installed after 1p.m. On May, 15th, 2024, and if you leave it in place after the exhibition ends, it will be collected when the booth is removed.
d. There will be a separate cost for the rental of the above additional equipment, and each different payment company will proceed. When applying for supplies, you will receive an individual fee guide.
Exhibition Information
a. Location: (135-731) Seoul Gangnam-gu Trade Center COEX
b. Floor load : 1.5 Ton/sqm
c. Cargo entrance : Vehicles exceeding 6M×8M (height) and 2.5 tons are prohibited from entering
d. Celing height limit : ** Contact the secretariat for details
e. Electricity supply: 220V, 60Hz, single phase/220V, 60Hz, three phase/380V, 60Hz, three phase